SafeTec’s Safety Tip of the Day: Avoid Fatigue

Tuesday, February 24th, 2009

Avoiding Fatigue

Physical or mental exhaustion can be threatening to your work performance. Too many people try to push themselves too far. It is important to make your priorities and to stick to them. Make sure that you get a full nights rest and come to work to be on the top of your game.

Tips for avoiding fatigue:

* Have others check your work.
* Watch for symptoms of fatigue in yourself and others.

Thank you

SafeTec

Top 10 Reasons the X-Deck is the Best Low Level Scaffolding. Period.

Tuesday, February 17th, 2009

Top 10 Reasons the X-Deck is the Best Low Level Scaffolding. Period.

The X-Deck by SafeTec

“Simplifying Safety”

  1. The X-Deck is lighter than traditional scaffolding. This allows for cheaper transportation costs and less worker fatigue.
  2. The X-Deck is ONE PIECE. There is no complicated setup like traditional scaffolding. You do not have to have a certified inspector to check to see if the X-Deck is properly setup because after use the X-Deck stays in one piece and does not have to be taken apart. This also keeps you from losing necessary pieces.
  3. The X-Deck is height adjustable. Although traditional scaffolding has some degree of adjust ability when it comes to different height settings the X-Deck adjusts up from its lowest setting in 7″ increments. This allows the worker to work at the PERFECT height for their application.
  4. The X-Deck is FIRST AND FOREMOST A SAFETY PRODUCT. The X-Deck has been recognized for its contributions in safety from safety organizations, nuclear power plants, State run organizations, and other trade related fields. Unlike traditional scaffolding that forces you to climb up stairs on the outside and climb over a rail, the X-Deck allows you to walk up comfortably and without any strain. The X-Deck comes standard with a handrail which most traditional scaffolding lacks. The X-Deck has a built in ANTI-SLIP, ANTI-TIP design that allows workers to work the full length and get their work done without fear of losing their tread or the product wanting to tip over.
  5. The X-Deck is extremely portable. The X-Deck can fold flat and pop open in seconds. It is simple and easy to setup. The X-Deck will allow you to get to your job site either carrying or rolling your X-Deck and then in a matter of seconds completely setup up the one unit or maybe even a second unit and a connecting board and get to the job at hand. This will allow you to easily move the X-Deck from job site to job site and be more productive.
  6. YOU CAN SET-UP 20FT OF WALKWAY IN LESS THAN 1 MINUTE. One of the great things about the X-Deck is that with 2 units and a connecting board (Either 8′ or 10′), one man can set up the 2 units and join them together with this walkway to have 20FT of walkway in less than 1 minute. Once you setup this walkway you can bridge over top of things you normally could not get to and where the only previous option was to spend hours setting up traditional scaffolding. You can setup the 2 units and the plank in a straight line, or curve the line, or even turn the 2 X-Deck parallel and connect them with a plank making a “C” shaped walkway. Any configuration you can think of you can do with the X-Decks. Plus you do not have to stop at 20ft! You can keep connecting additional planks and X-Decks together and build a walkway that can encircle a house!
  7. The X-Deck is stronger – MUCH STRONGER. While most scaffolding has a 500lbs capacity the X-Deck is certified to hold up to 2,000 lbs! This means you can feel comfortable getting more than one worker on an X-Deck or bring equipment up on the X-Deck with you. The X-Deck is stronger because it is hand made with only solid welds and not cheaply made by merely spot welding. The X-Deck is a stronger more quality product than any traditional scaffolding.
  8. The X-Deck is built to last. Yes traditional scaffolding is a little cheaper, but you get what you pay for. The X-Deck has been tested and proven to last 5 to 10 times the life of traditional scaffolding.  Depending on the usage of some traditional scaffolding they can be unsuitable for use as little as 6 months after purchase. The X-Deck WILL LAST 20 to 30 years of everyday industrial usage.
  9. The X-Deck can be customizable to fit your specific application perfectly. With different options including deck width, step width, wheel kits, work trays, connecting boards, many handrail options, and our ability to do custom work for you makes the X-Deck the perfect tool for your job.
  10. The X-Deck is SEXY. Not only is it sleek, chrome, simple to use, and a head turner, but it says something about who you are. You are someone that values strength, stability, and safety. You invest in safety and in making your company the best it can be. When you get to a job, pop open your X-Deck, and don’t even break a sweat or a smile you are going to look like the professional that you already are. Not only do you get a “step up” on your competition you will be the most memorable because you will be the safest, fastest, and best company around.

Read more about how the X-Deck is better than baker’s scaffolds.

Invest in Safety ~ Invest in SafeTec

SafeTec’s Safety Tip of the Day Feb 13th 2009

Friday, February 13th, 2009

Focus and Avoid Distractions

Distractions can occur from an unlimited number of outside influencers. These distractions can be as simple as a cell phone going off to thinking about the next job and not the job at hand.

Tips to avoid distractions:
* Go back 3 Steps when you return to a job.
* Use a detailed check list.

Invest in safety ~ Invest in an X-Deck

Industry Spotlight

Monday, February 2nd, 2009

According to The National Safety Councils’ Magazine entitled “Safety & Health“; Scaffolding, Ladders and Fall Protection are three of the Top 10 most frequently cited OSHA categories. These citations are common incidents that range from blatant safety disregards to product misuse. Here is a list of the Top 10 Most Frequent OSHA Violations from 2008 which is taken from the National Safety Councils’ website (www.nsc.org).

Workplace Safety Compliance

OSHA’s 10 Most Frequently Cited
Violations of 2008

Including links to training programs available through the National Safety Council

(OSHA’s list covers the period of October 1, 2007 through September 30, 2008.)

TOTAL VIOLATIONS


Rank

Offense

Number Issued

1. Scaffolding (1926.451 )
Compliance Training:
Construction sites
9,511
2. Hazard Communication (1910.1200)
Compliance Training:
Hazard Communication
6,662
3. Fall Protection (1926.501)
Compliance Training:
Construction sites
6,652
4. Respiratory Protection (1910.134)
Compliance Training:
Respiratory Protection
3,958
5. Lockout/Tagout (1910.147)
Compliance Training:
Lockout / Tagout
3,955
6. Electrical Wiring (1910.305)
Compliance Training:
Electrical Safety
3,371
7. Powered Industrial Trucks (1910.178)
Compliance Training:
Powered Industrial Trucks
Coaching the Lift Truck Operator
3,262
8. Ladders (1926.1053)
Compliance Training:
Construction sites
2,902
9. Machine Guarding (1910.212)
Compliance Training:
Machine Guarding
2,862
10. Electrical (1910.303 )
Compliance Training:
Electrical Safety
2,741

http://www.nsc.org/resources/issues/compliance.aspx

These common violations and safety issues derived from scaffolding and ladder use can be solved by using an X-Deck Work Platform. The X-Deck combined the portability and ease-of-set-up that one would expect from a step-ladder with the safety and increased productivity that is commonly found in scaffolding. The X-Deck; “Simplifying Safety.